... apart from those laid down in the decision of the European Union last year", concluded Academician Denkov, emphasizing that North Macedonia must fulfill the agreement.
The Progress - Новини
There is concrete progress on the project for the seventh
...... price of the two blocks of the North American project", which is quoted in the public space, the minister pointed out, also indicated by BTA.
Energy Minister Rosen Hristov and Bulgatransgaz CEO Vladimir Malinov will
...... last year it was agreed that the capacity, which was initially reserved by Bulgaria, would be increased from 500 million to 1 billion cubic meters.
The Minister of Energy Rosen Hristov and the executive director
...... to be completed before the start of the next heating season. The pipes are already being laid in parallel on the Bulgarian and Serbian sides.
On November 8 2022 a Monitoring Committee was held in
...... final meeting of the Committee, at which the results of the monitoring are summarized and the Monitoring Report is adopted accordingly. *Regulation (EURATOM) No. 2021/100
Energy transport and economic connectivity in the region as well
...... for the recent accession of Bulgaria and Romania to the Schengen area, which will contribute to strengthening security in Southeast Europe and within the EU.
There is progress in the construction of the Greece Bulgaria interconnector
...... I will see today, I will be calm that it will happen like this," the regional minister was quoted as saying by the press service.